FTI
54.59
0.38
Solutions
Technologies
Subsea Services
Projects
Africa
Asia-Pacific
Australia
Europe
North America
South America
Contact Us

ExxonMobil (Mobil) Yukon

ExxonMobile Yukon

U.S., Gulf of Mexico Block GC 60

Landmark: FMC Technologies’ first electro-hydraulic control system in the Gulf of Mexico

Mobil E&P developed the Green Canyon 60 field located 100 miles (160 km) offshore Louisiana in a water depth of 870 ft (265 m). The development consists of a subsea template tied back to the Mobil GC 18-A production platform. Yukon was the first project in the Gulf of Mexico to utilize an electro-hydraulic control system supplied by FMC.

The flowline gathering system for the oil/gas well fluid consists of two 6" pipelines each 7.7 miles (13 km) in length. The flowlines are connected to the GC 18-A platform by means of steel catenary risers (SCRs). Rigid spool pieces with ADS-assist swivel flanges are used to connect the flowlines to the subsea manifold. Hydraulic controls, chemical injection and electrical power are supplied to the subsea template from GC 18-A by means of an integrated service umbilical, which also contains a 3" steel pipeline for gas lift.

  • Contract Award: 1995
  • Sales: Houston, Texas
  • Fabrication: Houston, Texas
  • Service Base: Houston, Texas
  • Host Type: Platform
  • Contract Type: EPC