Technologies
Subsea Services
Projects
Africa
Asia-Pacific
Australia
Europe
North America
South America
Contact Us

Anadarko GC518

Anadarko GC518

U.S., Green Canyon Block 518

Landmark: Tied back to Marco Polo TLP

Equipment is insulated using FMC Novolastic™. Tree trim FF, ManTIS trim EE. MAX-8 hubs. Manifold and sleds controlled by tree SCMs. Trees use Sko Flo valves for chemcial injection.

  • Four EHXTs (potential for two more)
  • One four-slot manifold
  • Six inline sleds, four PLETs
  • Four well jumpers
  • Five flow jumpers
  • MCS
  • TUTA
  • Control Systems
  • Topsides HPU
  • System integration, testing, installation assistance, service and maintenance