Subsea Services
North America
South America
Contact Us

Total Laggan-Tormore

Block: West of Shetland Islands

Landmark: Project is for Total E&P UK Limited and follows on from the supply of UWD-15 wellheads and North Sea EHXT awarded previously.

The Laggan-Tormore Project is a technically challenging project facing extreme and harsh environmental challenges in the West of Shetland area. The initial phase of 9 wells will feed gas to a new purpose built gas terminal at Sullom Voe through 143 km 18” trunkline. The complete subsea production system will be controlled from the new terminal making the project the longest tie back to date, superseding tie back on the FMC Subsea Production System on Ormen Lange, Norway.

Water Depth: 594 m (1950 ft)
Tree Pressure: 10000 psi
Tree Type: Vertical
Tree Count: 9
Tree Bore Size: 5"x2"
Hydrocarbons: Gas