Technologies
Subsea Services
Projects
Africa
Asia-Pacific
Australia
Europe
North America
South America
Contact Us

CNR UK Frame Agreement

Europe_CNR_FrameAgreement

U.K. Blocks Banff, Toni, Thelma

Landmark: First FMC frame agreement in the U.K. sector

The maximum-function-enhanced horizontal tree is designed to be installed in any of the CNR fields in the Central North Sea. The tree-mounted direct hydraulic controls allow the tree to be interfaced with different types and suppliers of control systems based on a "plug and play" system using hydraulic and electrical jumper umbilicals with the approriate connectors that interface with tree-mounted controls. This system allows the tree design to be standardized and provide the flexibility to be installed in brown and green fields.    

The integral fishing-friendly structure (FFS) is the only protective structure approved by the Scottish Fisheries Federation and allows the tree assembly to be installed through a standard moon pool 6mx6m, eliminating the need for special installation vessels.

  • Four 5"x2" 10,000 psi WP Maximum-Function-Enhanced Horizontal Trees
  • Concentric all-metal sealing tubing hanger
  • Bi-directional metal sealing wire line plugs
  • Integral fishing-friendly structure approved by the Scottish Fishing Federation
  • Production and gas lift chokes
  • Tree-mounted direct hydraulic controls
  • API swivel flange flowline connection
  • Standard UWD-15 wellhead systems
  • System integration, testing, installation assistance, service and maintenance