Statoil Yttergryta

Norway_StatoilHydroYttergryta

Norway Midgard 6507/11

Landmark: Subsea structure built and installed before drilling of exploration well

The ISS was installed in January 2007.The flow base and PLEM were scheduled to be installed June 2008, the tie-in in August 2008 and the completion was scheduled for October 2008. Start-up was set for January 2009. Yttergryta is tied-in to Midgard X on the Aasgard field.

  • Statoil 45.75%, operator
  • Eni 9.9%
  • Petoro 19.95%
  • Total 24.5%