FTI
27.00
0.26
Technologies
Subsea Services
Projects
Africa
Asia-Pacific
Australia
Europe
North America
South America
Contact Us

Chevron Wheatstone

Location/Blocks: 140 Miles (225km) west of Onslow on the Pilbaba Coast in Western Australia

Landmark Comment:  First FMC Technologies Subsea Project for Chevron in Australia 

The Chevron-operated Wheatstone Project comprises the Wheatstone and lago gas fields, located offshore Western Australia in water depths between 330 and 850 feet (100 - 260 meters).  Production from these fields will be from subsesa wells and manifolds, transported through flowlines to the Wheatstone platform, where the gas and condensate will be further transported to the onshore LNG plant at Ashburton North.

  • Eleven (11) 7" EVDT Subsea Production Trees
  • Three (3) Six Slot Production Manifolds, and Five (5) Pipeline Termination Structures
  • UWD-15 RL Subsea Wellheads
  • Subsea and Topside FMC 600 Series Controls
  • Well Access Systems
  • Stabcon and UCON-H Tie-in and Connection Systems
  • Other Related Equilpment