FTI
54.51
0.10
Solutions
Technologies
Subsea Services
Projects
Africa
Asia-Pacific
Australia
Europe
North America
South America
Contact Us

Total E&P (UK)

Europe_TotalEP

U.K. Block Jura

Landmark: First FMC frame agreement in the U.K. sector.

The maximum-function EHXT is designed to be installed in any of the U.K. North Sea fields. The tree-mounted direct hydraulic controls allow the tree to be interfaced with different types and suppliers of control systems based on a “plug and play” system using hydraulic and electrical jumper umbilicals with the appropriate connectors that interface with tree-mounted controls. This system allows the tree design to be standardized and provide the flexibility to be installed in brown and green fields. The integral fishing-friendly structure (FFS) is the only protective structure approved by the Scottish Fisheries Federation and allows the tree assembly to be installed through a standard moon pool 361 ft2 (36 m2), eliminating the need for a special installation.

  • Contract Award: 2007
  • Sales: Aberdeen, U.K.
  • Fabrication: Dunfermline, U.K.
  • Service Base: Aberdeen, U.K.
  • Host Type: Dunbar
  • Contract Type: Contract