Project Overview
- Contract Award: 2005
- Sales: Aberdeen, U.K.
- Fabrication Trees: Dunfermline, U.K.
- Service Base: Aberdeen, U.K.
- Host Type: Platform
- Contract Type: Frame Agreement
Project Characteristics
- No. Trees: 1
- Water Depth: 100-140 m (328-460 ft)
- Tree Type: EHXT
- Tree Pressure: 10,000 psi
- Tree Bore Size: 5"
- Hydrocarbon: Oil
Project Ownership
- Talisman 58.97%
- Energy 41.03%
Scope of Work
-
One (1) enhanced horizontal 5" x 2" 10,000 psi subsea tree
-
One (1) concentric all metal-to-metal sealing tubing hanger
-
One (1) 18-3/4" UWD-15 subsea wellhead
-
Alloy steel block with Inconel 625-clad metal sealing wireline plug
-
Gas lift and Production chokes
-
Tubing Hanger Independent Secondary Lock (THISL)
-
Flowbase, 10K, with Torus II multibore hub
-
Workover control system
-
ROV interface/override
-
Tool Rental
-
Diverless workover
- Integral, rig deployed, structure approved by the Scottish Fishing Federation as a fishing-friendly protection structure
Comments
The Wood oil field is located close to the Montrose, Abroath and Arkwright ("MonArb") field complex. The field will be produced by a single horizontal development well tied back to the existing Montrose production platform 9.5 km away. A compression moduel will be installed on the platform to compress and export gas from the Wood field. Associated gas from the MonArb complex, which is currently being flared, will in future be compressed and exported using the new facilities. Oil from Wood will be transported to shore via the Forties Pipeline System, whilst gas from Wood and the MonArb complex will be exported via the CATS gas pipeline system. Production will start in late 2006.