CNR UK Frame Agreement

U.K. Blocks Banff, Toni, Thelma

Landmark: First FMC Frame Agreement in UK Sector

Project Overview

  • Contract Award: 2004
  • Sales: Aberdeen, U.K. 
  • Fab.: Dunfermline, U.K.
  • Service Base: Aberdeen, U.K.
  • Host Type: Platform
  • Contract Type: Frame Agreement 

Project Characteristics

  • No. Trees: 4
  • Water Depth: 107-137 m (350 - 450 ft)
  • Tree Type: EHXT
  • Tree Pressure: 10,000 psi
  • Tree Bore Size: 5"x2"
  • Hydrocarbon: Oil

Project Ownership

  • CNR International 100%

Scope of Work

  • Four (4) 5"x2" 10,000 psi WP maximum function enhanced horizontal trees
  • Concentric all metal sealing tubing hanger
  • Bi-directional metal sealing wire line plugs
  • Integral fishing friendly structure approved by the Scottish Fishing Federation
  • Production and gas lift chokes
  • Tree mounted direct hydraulic controls
  • API swivel flange flow line connection
  • Standard UWD-15 wellhead systems
  • System integration, testing, installation assistance, service and maintenance

Comments

The maximum function enhanced horizontal tree is desogned to be installed in any of the CNR fields in the central north sea. The tree mounted direct hydraulic controls allow the tree to be interfaced with different types and suppliers of control systems based on a "plug and play" system using hydraulic and electrical jumper umbilicals with the approriate connectors that interface with tree mounted controls.  This system allows the tree design to be standardized and provide the felxibility to be installed in brown and green fileds.    

The integral fishing friendly structure (FFS) is the only protective structure approved by the Scottish Fisheries Federation and allows the tree assembly to be iinstalled through a standard moon pool 6 meters x 6 meters eliminating the need for a special installation vessels.

 