StatoilHydro Yttergryta

Blocks: Midgard 6507/11

Landmark: Subsea structure built and installed before drilling of exploration well.

Project Overview
Contract Award Date: LOI 12.07.2007
Sales Location: Kongsberg, Norway
Fabrication: Trees, Dunfermline U.K. Controls, Kongsberg
Service Base: Åsgard Drift Stjørdal, Norway
Host Type: Platform
Contract Type: EPC

Project Characteristics
No. Trees: 1
Water Depth: 298 m
Tree Type: HXT
Tree Pressure: 10,000 psi
Tree Bore Size: To be decided upon
Hydrocarbon: Gas

Project Ownership
StatoilHydro 45,75 %, operator
Eni 9,9 %
Petoro 19,95 %
Total 24,5 %

Scope of Work
1 HXT System
1 Flow base
1 Integrated Satellite Structure with SSP
1 Pipe Line End Manifold with WGM
1 Nearby Protection Structure
1 Umbilical 6 km
Termination Heads, Tie-in and Pigging Equipment
Fail Close Valve Skid

Comments
ISS installed January 2007, Flow base and PLEM to be installed June 2008, Tie-in August 2008 and Completion October 2008. Start-up January 2009. Yttergryta is tie-in to Midgard X on the Aasgard field.

 