Green Canyon Block 518
Landmark: Tied back to Marco Polo TLP
Project Overview
- Contract Award: 2004
- Sales: Houston, Texas
- Fabrication: Houston, Texas
- Service Base: Houston, Texas
- Host Type: TLP
- Contract Type: EPC
Project Characteristics
- No. Trees: 4
- Water Depth: 1,280 m (4,200 ft)
- Tree Type: EHXT
- Tree Pressure: 10,000 psi
- Tree Bore Size: 5"
- Hydrocarbon: Oil
Project Ownership
Scope of Work
- Four (4) EHXTs (potential for two more)
- One (1) four slot manifold
- Six (6) inline sleds, four (4) PLETs
- Four (4) well jumpers
- Five (5) flow jumpers
- MCS
- TUTA
- Control Systems
- Topsides HPU
- System integration, testing, installation assistance, service and maintenance
Comments
Equipment is insulated using FMC Novolastic™. Tree trim FF, ManTIS trim EE. MAX-8 hubs. Manifold and sleds controlled by tree SCMs. Trees use Sko Flo valves for chemcial injection.