Anadarko GC518

Green Canyon Block 518

Landmark: Tied back to Marco Polo TLP

Project Overview

  • Contract Award: 2004
  • Sales: Houston, Texas
  • Fabrication: Houston, Texas
  • Service Base: Houston, Texas
  • Host Type: TLP
  • Contract Type: EPC

Project Characteristics

  • No. Trees: 4
  • Water Depth: 1,280 m (4,200 ft)
  • Tree Type: EHXT
  • Tree Pressure: 10,000 psi
  • Tree Bore Size: 5"
  • Hydrocarbon: Oil

Project Ownership

  • Anadarko 100%

Scope of Work

  • Four (4) EHXTs (potential for two more)
  • One (1) four slot manifold
  • Six (6) inline sleds, four (4) PLETs
  • Four (4) well jumpers
  • Five (5) flow jumpers
  • MCS
  • TUTA
  • Control Systems
  • Topsides HPU
  • System integration, testing, installation assistance, service and maintenance

Comments

Equipment is insulated using FMC Novolastic™. Tree trim FF, ManTIS trim EE. MAX-8 hubs. Manifold and sleds controlled by tree SCMs. Trees use Sko Flo valves for chemcial injection.

 

Download

Anadarko GC518

Anadarko GC518



   WWW.FMCTECHNOLOGIES.COM
 |