Total ROSA

Angola Block 17

Landmark: Leading edge in thermal insulation of subsea systems


Project Overview:


Contract Award:2004
Sales: Kongsberg, Norway

Fabrication:
• Trees: Dunfermline, U.K.
• Controls: Kongsberg, Norway

Service Base:  Luanda, Angola
Host Type: FPSO
Contract Type: EPC


Project Characteristics:

  • No. Trees: 27
  •  Water Depth: 1300 - 1400 m (4,265 ft - 4,593 ft)
  • Tree Type: Dual 5" x 2" Conventional
  • Tree Pressure: 5,000 psi
  • Hydrocarbon: Oil and Gas

Project Ownership:

  • Total: 40 %
  • ExxonMobil: 20 %
  • BP 16.67%
  • StatoilHydro   23.33% 


Scope of Work:

  • Twentyfive (25) UWD-15 Wellhead Systems w/ Guide Bases 
  • Fifteen (15) Production Trees 
  • Twelve (12) Injection Trees 
  • Installable / Retrievable Choke Inserts 
  • Four (4) Production Manifolds 
  • Connection Systems for Flowlines and Umbilicals (connection to manifolds and trees) 
  • Insulation Caps for 21 hour cool down time. 
  • Insulation Caps for 8 hour cool down time. 
  • Multiplexed Electro Hydraulic Production Control System 
  • Acoustic Monitoring System 
  • Refurbishment of existing Workover Equipment w/ associated Control System 
  • Installation and Commissioning Support 
  • Workover Umbilical
  • System integration, testing, installation assistance, servcie and maintenance


Comments:

The SPS-contract includes significant development of new thermal insulation solutions involving both small scale thermal tests for calibration of analysis and full scale cool down tests of both tree and manifold systems. For the last injection tree the contract scope was also extended to include development of a pilot fiber optic downhole gauge system including full integration test. A significant amount of work is done in Angola. Management, fabrication and testing of the manifold systems are localized in Soyo. Service assistance, production guide bases, assembly of well jumpers and refurbishment of the existing Girassol tools are the significant activities taking place in Luanda.

First oil on Rosa was 18 June 2007. The maximum oil production rate is expected to be 140,000 to 160,000 bbl/day. Revenue from oil production is shared by partners and Sonangol through a Production Sharing Agreement. The existing Girassol FPSO processes the fluids produced from the subsea production and injection wells. Looped flowlines accommodate the production from the Rosa D and Rosa E fields.

Manifolds are on-line to the flowlines. Water injection is used to provide reservoir pressure maintenance. Injection water is transported by a single flowline for the Rosa D system and a single flowline for the Rosa E system.

Additional equipment added for delivery in 2009: two (2) production trees, two (2) injection trees and two (2) UWD-15 wellhead systems.


 