- Increased installation and operational flexibility over the horizontal tree
- May be installed either before or after the well jumpers are connected between the flowline sled and the tree’s tubing head assembly
- Provides substantial logistic benefits and related cost savings at an overall field development level
- Tubing heads can be preinstalled in a low-cost manner (e.g. HCLS) from an anchor-handling vessel, if desired, prior to mobilizing a drilling rig for the subsea well completion activities.
- Production tubing string can be installed before the trees are delivered. This is achieved by delivering the tubing head and tubing hanger assemblies on an accelerated schedule when this is beneficial to the client. Early delivery of tubing heads and tubing hangers allows wells to be completed in batch mode, which shortens rig time and allows the drilling rig to be released early
- The trees can subsequently be installed using cable (or drill pipe, depending on vessel capability) from a variety of vessels, including anchor-handling vessels, construction vessels or drilling rigs, whatever best suites the operator’s cost targets and logistical needs with respect to vessel rates and availability. Due to this advantage, FMC’s customers have completed a ten tree installation program using these processes and averaged just one (1) single day of installation time on the drilling rig’s critical path for installation of the whole tree system, including the tubing head, tubing hanger, tree and tree cap.
- EVXT's can be retrieved without de-completing the well if repairs are needed due to external damage.
- FMC’s modern-design system is also as time-efficient as traditional horizontal trees during workovers that require the production tubing string to be retrieved. Tubing retrieval workovers are normally touted as a primary advantage for horizontal trees, but field experience with FMC’s Enhanced Vertical Tree system proves otherwise.
- For workovers that only require access to enter the production tubing, vertical trees have an advantage over horizontal trees. Tubing access through vertical trees is achieved by simply opening valves in the tree and workover safety package. In comparison, two sets of wireline plugs need to be retrieved from the horizontal tree to gain access to the well bore. Wireline work is more time consuming and is potentially more troublesome than opening valves.
FMC's guidelineless EVXT, is available in two models: a 5" x 2", 15,000 psi, 350º F (a High Pressure, High Temperature (HPHT) system) and a 4" x 2", 10,000 psi system
The EVXT tree is the world's most technologically advanced tree system and is rated for water depths of up to 10,000 feet. Numerous successfull systems have been successfully installed since 1998, making FMC the dominant subsea supplier of field proven subsea completion systems. The 10,000 psi EVXT system is currently operating on one of the world's deepest producing well, Shell Coulomb C-2, in 7,570 feet of water.
- A dual bore tree, an ROV tree cap and a slim OD, concentric bore tubing hanger that is installed into a tubing head assembly. Using a tubing head provides numerous reliability and operational advantages, including a simplified wellhead interface, factory tested sealing surfaces for the tubing hanger, and a tubing hanger orientation system that is independent of the BOP.
- The well jumper connects to the tubing head assembly instead of the tree to give the operator complete logistical flexibility over the sequence of tree and well jumper installations and retrievals.
- A pressure-containing tree cap that is installed and retrieved by ROV off the rig critical path, saving days of expensive, deep water rig time.
- The tree is designed to overcome flow assurance challenges in deep water by providing numerous chemical injection points and state-of-the art Novolastic™HT insulation, which is rated for 350º F.
- The tree accommodates intelligent well completions with ease, featuring up to 11 downhole penetrations. All of this down-hole functionality is packaged into a slim OD tubing hanger system that will drift through slender 13-5/8" ID drilling risers to provide life-of-field intervention advantages.
- A workover riser system is field proven aboard one of the largest and most sophisticated dynamically positioned drill ships in the world. It provides quick disconnect, fail-safe functionality and is reliaby operated by an electro-hydraulic control system with acoustic back-up.
- a high-pressure, high-temperature (HPHT) subsea completion system up to 10,000 ft. water depth rating and 17D temperature class: 0° - 350°F
- Standard vertical tree system suitable for oil and/or gas wells
- Standard tree may be employed on individual satellite wells or clustered wells around a manifold
- Upper connection on the tree is an 18-3/4" or 16-3/4" 15K H-4 profile
- Electro-hydraulic control system
- Hydraulic set, concentric, 13-3/8" mono bore tubing hanger system
- Capable of providing up to 11 downhole lines for control, monitoring and chemical injection
- Annulus flowloop is integral to the composite valve block and the production wing block
- Premium FMC Model 3000 metal sealing gate valves are used for production, annulus, and crossover valves
- 2" and 5" 15K actuated valves use M3000 actuators with linear override
- Premium FMC M175 metal sealing actuated gate valves are used to isolate chemical injection lines
- Metal sealing needle valves are used to isolate test lines
- Vertical flowline tie-in system with FMC MAX-8 mechanical connector
- Tree is designed to allow easy accessibility for ROV operation and visual inspection
- Erosion resistant block elbows used in tree piping
- Sacrificial anodes designed for a 20 year service life
- Production Pressure/Temperature transducers upstream and downstream of the choke valve
- Annulus Pressure/Temperature transducer downstream of the AMV valve
- HW 540 / Transaqua Control Fluid
- Material class: "HH" with inlaid ring grooves and sealing areas, NACE, H2S service
- Tree, tubing head and tubing hanger designed in accordance with API 17D PSL-3
- 17D temperature class: 0° - 250°F
- Dual bore 4" x 2" 10K working pressure
- Vertical tree suitable for oil and/or gas wells
- 7,500 ft. water depth rating
- Upper connection on the tree is 13-5/8" FMC Torus III clamp hub profile
- Electro- hydraulic control system
- Hydraulic set, concentric, 11-3/4" mono bore tubing hanger system
- Capable of providing up to 9 downhole lines for control, monitoring and chemical injection
- Premium FMC Model 130 metal sealing gate valves are used for production, annulus, and crossover valves
- 2" and 4" 10K actuated valves use FMC deepwater actuators with rotary override
- GLL installation and retrieval of tree, tubing head and BOP
- ROV installable/ retrievable tree cap
- Vertical flowline tie-in system with FMC Torus III integral hydraulic connector
- Material class: "FF" with inlaid ring grooves and sealing areas, NACE, H2S service
- Tree, tubing head and tubing hanger designed in accordance with API 17D PSL-3
FMC's EVXT enhanced vertical trees with dual bore tubing hangers are available in two 10,000 psi configurations: a 4" x 2" guideline style design and a 5" x 2" guidelineless design. Dual bore tubing hangers are installed directlyin the wellhead, eliminating the need for a tubing head and making the system an efficient solution for wells that are drilled and completed without removing the BOP stack from the well. This "drill and complete" efficiency is complemented by two additional time-saving features: a hydraulically operated annulus isolation valve in the tubing hanger (that eliminates the need to run an annulus wireline plug) and an ROV installed, pressure-containing tree cap.
The guideline style EVXT tree system is an economical solution in water depths of up to 2,500 feet where a simple tubing string can be used as the completion riser. Over 80 of the guideliness style vertical trees are installed in the Gulf of Mexico and offshore West Africa.
The guidelineless EVXT system has proven to be the most economical deepwater solution for very large subsea field developments like Total's Girassol, Jasmine and Rosa projects and BP's upcoming Greater Plutonio project, all offshore Angola.
Legacy 10K Vertical Subsea Tree