- Subsea manifolds
- Jumpers
- Sleds
- Subsea HIPPS
- Subsea pig launchers
- Flowline swivels
-
Reduce pressure rating of flowline and riser wall thickness
-
Thinner wall pipe / lower material costs
-
Lower fabrication, handling and transportation
-
Enabler to use existing suite of offshore installation vessels
-
Lower riser hang-off loads
-
Enable tie-in to existing flowline/riser infrastructure and host facility
-
Increase cross-sectional area to flow and achieve 5 to 35% increase in net flow rate:
-
Accelerate production / Increase project NPV
-
Lower abandonment pressure
-
Higher flowing wellhead temperature and arrival temperature
-