|
|
Increased Oil Recovery. Room 610 |
| 2.00pm - 4.30pm |
Well Intervention in Deep Waters Paper #19552 E.M. Mathiassen and P.K. Munkerud, StatoilHydro; H.B. Skeels, FMC Technologies, Inc. |
|
|
|
Advances in Deepwater Drilling Technology. Room 610 |
| 9.30am - 12.00pm |
Development of the 18-3/4" 20,000 psi Subsea Wellhead System for High Pressure and High Temperature Applications Paper #19694 S.Singeetham and B. McCoy, Jr, FMC Technologies, Inc. |
|
|
|
Increased Oil Recovery. Room 610 |
| 2.00pm - 4.30pm |
Well Intervention in Deep Waters Paper #19552 E.M. Mathiassen, P.K. Munkerud, StatoilHydro; H.B. Skeels, FMC Technologies, Inc. |
Subsea Processing. Room 312 |
| 9.30am - 12.00pm |
Functional Verification of the World’s First Full-Field Subsea Separation System, TIORA Paper #19328 G. Mogseth, FMC Technologies |
| |
The Pipe Separator: Simulations and Experimental Results Paper #19389 S. Sagatun, P. Gramme, G.H. Lie, StatoilHydro; T. Gilhuus, Norsk Hydro; T. Ruud, O.J. Horgen, M. Storvik, FMC Technologies |
Well Completion Equipment and Methods. Room 600 |
| 9.30am - 12.00pm |
All-Electric Subsea Tree System Development Paper #19547 V.S. Halvorsen, FMC Technologies; E. Koren, Statoil |
|